<?xml version="1.0" encoding="Windows-1256" ?>
<rss version="2.0">
<channel>	<title>المؤتمر نت</title>
	<link>http://www.almotamar.net</link>
	<description>صحيفة إلكترونية يومية تصدر عن حزب المؤتمر الشعبي العام (اليمن)</description>

<item>
	<title>Dno Announces Well Results And New License Interests In Yemen</title>
	<link>http://www.almotamar.net/2998.htm</link>
	<pubDate>2007-07-11</pubDate>
	<description>The Godah 7 development well was drilled to a total measured depth of 2,386 meters (approximately 200 meters into Basement) and subsequently plugged back and completed as a producing Qishn S1A oil well. Godah 7 was drilled at a location approximately 770 meters east of the Godah 6. Godah 7 is currently producing 438 barrels of oil per day and 7 barrels per day of water from a 4 meter interval in the Qishn S1A sand. The production rate is pump constrained. Installation of a higher capacity down-hole electrical submersible pump (ESP), which could double the production, will be considered once the production has stabilized.</description>
</item>
</channel>
</rss>